Bathroom Reveal Part 2

11 Dec

Greetings again! Here is the follow up to this post (bathroom reveal part 1 – before and during). I’ll let the pictures speak for themselves and note a few things here and there.

The picture below is what you see from the family room. We actually finished off this hallway area, as well (all those deets will come in another post). To recap, this is a small bathroom – only about 8’x8′ – so we didn’t have a lot of square footage to work with. However, I still wanted to do what I could to make it as lovely and spa-like as possible.

We chose a clear glass shower to keep things open and airy in there. The glass was the single largest cost of the bathroom, but really a focal point.

IMG_0545

Before and after:

2

IMG_0563

IMG_0564

We decided on a large mirror that covered most of the width of the wall – again, to make the room look bigger. The vessel sink is a pretty fun part of the bathroom, but this purchase was actually partly for function, and partly for form. This bathroom has no storage…not a linen closet or drawer or anything. So, we decided against a pedestal sink because we needed every extra bit of storage we could get. Also, we only had about 20″ to work with as far as space for a vanity, and this ended up being one of the most narrow ones we could find. Luckily, it looks pretty cool!

IMG_0562The picture below gives shows a few different things that we chose in order to give it that spa feel. I wanted a very soft green paint. This color is Morning Zen by Valspar. How fitting! 🙂 I also wanted towel hooks instead of a towel bar, just for something different and because I liked the look of it. It was hard to find exactly what I wanted, so I made my own! (I’ll cover than in a different post) I will be doing something similar for a hand towel hook. I also made the little curtain out of some sheer white fabric. IMG_0547

Here is a better shot of the shower floor. I was recently in the steam room of a spa that had walls in this same style of stone. I felt very validated. 🙂 People ask if it’s uncomfortable to stand on, and it’s not. It feels kinda like a massage for the feet.

IMG_0560

Ryan also put the same stone in the back of the shower niche where we put shampoo and conditioner, etc. Also, we decided on a rainfall shower head that comes down from the ceiling to prevent the water from spraying out the door onto the floor before the door was closed (which would have been a problem if the shower head came out of the wall).

IMG_0561

Here is a better shot of the completed bamboo ceiling.

IMG_0548

Here’s a before and after of that lovely hole…

6

IMG_0557

So folks, there you have it. Our downstairs bathroom, almost completely finished by a couple of fairly new DIYers. We had the following outsourced: plumbing, tape and texture of the walls, and installation of the shower glass.

Love can’t quite describe how we’re feeling about our new bathroom…it’s more like….lurrrve.

Bathroom Reveal: Part 1

6 Dec

Well, it’s almost time to show off the final product of our basement bathroom. Since this was such a long, involved project, I am breaking it up into two parts. This is part one – before and during. And believe it or not – this is the condensed version of the story! (click here to view part 2 of the bathroom reveal)

We did basically 90 percent of it ourselves. I have to give a big shout-out right away to Ryan, who did the demolition, duct work, wall building, electrical, sheetrock, tiling, ceiling, trim…etc. (with help from a few handy friends and family). I did the finishing, like painting, decorating, choosing decor, making the curtain, painting, painting, painting…(the painting of the doors and trim seemed to never end!).

(Warning: this post contains mostly pics, and much less of my witty rhetoric. Next time…)

Our basement bathroom was gross and it needed to be redone…as in, gutted and rebuilt. It had all kinds of good stuff in it, like:

  1. Paneling. When will this stuff just die already??
  2. Stained linoleum.
  3. An old, gross sink and toilet.
  4. A  shower that was flimsy and beyond repair. And it could only be cleaned so much; we couldn’t get in the unsealed cracks.
  5. A drop ceiling with tiles that were both missing and falling out.
  6. A hole in the wall. A hole! In the wall!

2

3

Note the sagging ceiling tiles:

5

8

12

7

(Note the hole in the wall toward the top center of the picture below. No, not the one in the ceiling. The other hole.)

6

See…I told you it was gross. I didn’t use this bathroom, and I didn’t let company use it, either. So, we gutted it down to the studs. We were starting from scratch (toilet stayed in for awhile but we wanted as little time as possible with only one bathroom, so eventually it came out, too).

19

24

We decided that we wanted a built-in, tiled shower, not a shower kit. After a flimsy, gross shower, we wanted something that felt sturdy and more elegant. So, here are a few pictures what Ryan had to do to build in the shower:

32

086

088

In the midst of building the shower curb was sheetrocking everything but the ceiling, as well as painting the walls a soft, light green (I’ll have the paint color in the next post). We elected to have another drop ceiling since our upstairs bathroom is directly above this one. If there were any water problems or any reason we might need to get at the upstairs bathtub plumbing, we would have had to tear open the sheetrocked ceiling. So, we chose bamboo ceiling planks. Boy, drop ceiling choices have come a long way! We really love this ceiling. (Ryan had some extra hands to help with this – his dad and brother! Thanks guys.)

89

93

Next came the tiling. Ryan tiled everything, and I am so proud! If you’ve never done it…tiling is a mess! We also decided to splurge and added a heating component that heats the tile up. Again, this bathroom is downstairs, and ceramic tile can get chilly! The heated tile was totally worth the price. Below you can see the coils all laid out (the thermostat is on the wall outside of the bathroom).

60

This is the self-leveling concrete that goes on top of the coils.

63

Here’s the start of the tiling. Lots of planning and measuring happens before anything begins.

155 (2)

The shower tiling came next. We spent a lot of time thinking about what tile colors and styles to go with. I knew I wanted a bathroom that had neutral tiles so I could be more free to pick/change the wall colors. We chose a beige, semi-rustic looking tile for the floor, with a smaller version in the shower walls. The grout was a dark brownish-gray. The accent tile on the floor and the cutout in the shower is black pebble – another splurge but so worth it. This bathroom is small, but I really wanted it to feel posh and spa-like…and we were getting there!

158 (2)

215

Somebody was snooping around where she shouldn’t have been.

212

Stay tuned for the next update and see the afters. That’s enough to look through for now…:)